Lithuania Electricity Production

Lithuania · Monthly series · EC-LT-ELP

Latest, August 2026

611.9 pts

-6.6% from July 2026

Open interactive chartLithuania Electricity Production in the app

1213704.9196.8September 2016August 2027
History through August 2026, the forecast path to August 2027 (dashed) and its 80% interval (shaded).

Forecast

Forecast for August 2027: 614.6 pts, with an 80% interval of 336.8 pts to 978.1 pts.

Forecast path. Intervals are shown where available.
PeriodForecast80% low80% high
September 2026645.3 pts560.8 pts749.4 pts
October 2026752.4 pts637.3 pts882.6 pts
November 2026744.0 pts616.7 pts884.3 pts
December 2026857.1 pts573.2 pts1,145.3 pts
January 2027888.3 pts556.7 pts1,213.0 pts
February 2027788.6 pts534.6 pts1,060.5 pts
March 2027798.9 pts577.2 pts1,025.6 pts
April 2027760.1 pts591.4 pts939.4 pts
May 2027679.2 pts422.4 pts980.7 pts
June 2027625.0 pts335.6 pts995.2 pts
July 2027616.6 pts361.1 pts952.2 pts
August 2027614.6 pts336.8 pts978.1 pts

Model: Agentic Investor TSFM (foundation model). Forecast generated 2026-11-15.

AI confidence

Needs refresh

The data refresh is due. Confidence will be reassessed against the refreshed history.

Model: Agentic Investor TSFM (foundation model)

Accuracy vs naive
n/aNot evaluated
Direction
n/aNot evaluated
Turning points
n/aNot evaluated
How this assessment is made

AI confidence describes historical evidence for this forecast, not a probability of being correct. Each backtest fits on data available before its test window. The baseline carries the last value forward. Supported evidence requires at least six complete, non-overlapping tests, an error ratio below 0.90 (rounded to two decimals), and wins in a majority of tests. Ratios from 0.90 to below 1.10 are on par; 1.10 or above is weak evidence. Inconsistent wins produce mixed evidence. For a selected model, only the recent tests excluded from model selection determine this label. These are historical simulations using the available data, not a live trading track record; revisions and foundation-model pretraining can limit how closely they reproduce a past decision. Past performance can change.

Model comparison

Comparison pendingA new ticker first receives its serving model's forecast and evaluation. An eligible nightly batch can compare both candidates, subject to call budgets and retry limits.

Reading

It is above 86% of the 119 earlier readings since September 2016.

Written from the figures by a fixed template; no AI model is involved.

Recent history (24 observations)
The 24 most recent observations, newest first.
PeriodValue
August 2026611.9 pts
July 2026655.4 pts
June 2026539.4 pts
May 2026694.3 pts
April 2026788.4 pts
March 2026693.1 pts
February 2026771.1 pts
January 2026948.3 pts
December 2025798.0 pts
November 2025638.7 pts
October 2025722.7 pts
September 2025545.7 pts
August 2025520.9 pts
July 2025457.1 pts
June 2025629.0 pts
May 2025699.2 pts
April 2025758.1 pts
March 2025772.3 pts
February 2025571.9 pts
January 2025791.1 pts
December 2024751.1 pts
November 2024620.9 pts
October 2024518.7 pts
September 2024450.9 pts

Source

Data: public market data feeds.

More from Agentic Investor

Also stored for Lithuania